Installed the two remaining brackets and ran the corrugated tubing to the aft fuselage. Cut a piece of the AOA tubing from the wing and ran it aft. Also ran the static line forward for the standby EFIS. On a side note, I dropped the manual pull riveter on the floor of the fuselage and left a nice dent. Hoping the paint shop can work that out.